Hello,
I would like some advice as to how to model a production/face drill to simulate both the heat and water addition within the mine. Assuming that the drill specification is 65kW electrical power and uses 60l/m water I have set the sensible heat attribute to 65kW and the point Moisture to be 1000ml/sec in the 'Heat Moisture Diesel' presets . I have ignored the diesel parameters as they would only be used during tramming. I then rerun the simulation and look at the New Heat showing 65kW and New Sensible Heat parameter and it is showing 76.8kW so far so good I think.
My question is a) Is this the correct way of modelling this drill? b) How can I view the water that has been added to the model? What is the best variable to inspect?
Thanks in advance,
Laura